Home | About us | Administration | Academic | Finance | Contact us | Overview

  PROPERTY REGISTER PROFORMAS

 

 

Construction

Navodaya Vidyalaya Samiti, Pune Region is having 54 Jawahar Navodaya Vidyalayas' as on date covering Maharashtra, Gujarat, Goa and U.Ts of Daman, Diu and Dadra Nagar Haveli. Of these 54 JNVs, 31 are situated in Maharashtra, 18 in Gujrat, 2 in Goa and 3 in U.Ts.

Of the 31 JNVs in Maharashtra, 19 have full fledged campus with only repair works/Sp. Repair works to attend. 10 JNVs (Buldana, Chandrapur, Gadchiroli, Gondia, Latur, Nagpur, Pune, Raigad, Thane, Yavatmal) are having different works such as Phase B or II, Balance Works and Staff Quarters et_. to be completed Isanctioned. 2 JNVs (Ratnagiri, Akola) are running in temporary accommodation. Only one JNV (Parbhani) is to start functioning due to non-availability of temporary accommodation. 4 Districts remain uncovered. Of these 4, 2 are in Mumbai and other 2 have proposals for selection of site at advanced stage. There were 4 Construction Agencies of which NBCC, RPNN, NIDC have been' withdrawn from allotting works and only CPWD is being entrusted with works at present.

There are 18 JNVs in Gujarat only 8 Vidyalayas are having completed campus with repairs and Sp. Repairs to be attended. 7 JNVs (Banaskantha, Bharuch, Bhavnagar, Gandhinagar, Jamnagar, Patan, Rajkot) are having different works such as Phase B, Balance Works and Staff Quarters etc. to be completedl sanctioned. 3 JNVs (Mehsana, Panchmahal, Vadodara) are running in temporary accommodation. Only one JNV (Dangs) is sanctioned but yet to start functioni'ng due to non­availability of temporary accommodation. 6 Districts remain uncovered. Of these 6, 3 are yet to come up with suitable land proposal and other 3 have proposals for selection of sit_ at advanced stage. There were 4 Construction Agencies of which GSCC, NBCC, GNFC have been withdrawn and only CPWD is being entrusted with works at present.

In Goa we have 2 JNVs and one NLI. Both JNVs are functioning at Permanent site. But, both the vidyalayas does not hav'e complete campus. There are 3 Construction Agencies i.e., NBCC, KLAC and CPWD.

All the 3 Union Territories (Daman, Diu & Dadra Nagar Haveli) are having full fledged campus with only B class rooms and 2 labs for up to class X only. Repair works, development of play fields etc. are to be attended. There were 2 Construction Agencies i.e., GSCC and CPWD.

Two JNVs (Akola, Dangs) have been accorded sanction for preconstruction activities for' Phase A. 3 JNVs (Parbhani, Mehsana, Vqdodara) are yet to be sanctioned Phase A. 6 JNVs (Banaskantha, Bhavnagar, Gandhinagar, Pune, Raigad, Thane) require Phase B to be sanctioned so that they can be upgraded to Category A(BO intake).

ANNEX. -I

STATUS OF JNVs IN COVERED DISTRICTS

REGION  PUNE

Sr.No. state district Established / Functional Permanent/ Temporary Site PlayField

(availability)

Yes/No

J.N.V. works in progress at permanent site.(Y/N) J.N.V. where land yet to be allotted Remark
1 2 3 4 5 6 7 8 9
1  GOA NORTH GOA Functional Permanent Sanctioned Yes    
2 SOUTH GOA Functional Permanent Yes Yes
3  GUJARAT BANASKANTHA Functional Permanent Sanctioned Yes    
4 BHARUCH Functional Permanent No Yes    
5 BHAVANAGAR Functional Permanent In Progress Yes    
6 DAHOD Functional Permanent Sanctioned Yes    
7 DANGS Not Functional   Yes Yes   PH. -A is sanctioned
8 GANDHINAGAR Functional Permanent Yes Yes    
9 JAMNAGAR Functional Permanent No Yes    
10 JUNAGAD Functional Permanent Yes Yes    
11 KHEDA Functional Permanent No Yes    
12 KUTCH Functional Permanent Yes Yes    
13 MEHSANA Functional Temporary Sanctioned Yes   PH. -A is sanctioned
14 PANCHMAHALS Functional Temporary No No No  
15 PATAN Functional Permanent Yes Yes    
16 PORBANDAR Functional Permanent Sanctioned Yes    
17 RAJKOT Functional Permanent Sanctioned Yes    
18 SABARKANTHA Functional Permanent Yes Yes    
19 SURAT Functional Permanent Sanctioned Yes    
20 SURENDRANAGAR Functional Permanent In Progress Yes    
21 VADODARA Functional Temporary Yes Yes   PH. -A is sanctioned
22  MAHARASHTRA AHMEDNAGAR Functional Permanent Yes Yes    
23 AKOLA Functional Temporary Sanctioned Yes Partly allotted PH. -A is sanctioned
24 AMRAVATI Functional Permanent Yes Yes    
25 AURANGABAD Functional Permanent Yes Yes    
26 BEED Functional Permanent No Yes    
27 BULDHANA Functional Permanent Yes Yes    
28 CHANDRAPUR Functional Permanent Yes Yes    
29 GADCHIROLI Functional Permanent Yes Yes    
20 GONDIA Functional Permanent Yes Yes    
31 HINGOLI Functional Permanent Yes Yes    
32 JALGAON Functional Permanent Yes Yes    
33 JALNA Functional Permanent Yes Yes    
34 KOLHAPUR Functional Permanent Sanctioned Yes    
35 LATUR Functional Permanent Yes Yes    
36 NAGPUR Functional Permanent Sanctioned Yes    
37 NANDED Functional Permanent Yes Yes    
38 NANDURBAR Functional Permanent Yes Yes    
39 NASIK Functional Permanent Yes Yes    
40 OSMANABAD Functional Permanent Yes Yes    
41 PARBHANI Functional Temporary Yes Yes   PH. A Sanctioned
42 PUNE Functional Permanent Yes Yes    
43 RAIGAD Functional Permanent Sanctioned Yes    
44 RATNAGIRI Functional Temporary Sanctioned Yes   To be shifted to permanent site
45 SANGLI Functional Permanent Yes Yes    
46 SATARA Functional Permanent Yes Yes    
47 SINDHUDURG Functional Permanent Yes Yes    
48 SOLAPUR Functional Permanent Yes Yes    
49 THANE Functional Permanent Sanctioned Yes    
50 WARDHA Functional Permanent Yes Yes    
51 WASHIM Functional Permanent Yes Yes    
52 YAVATMAL Functional Permanent Yes Yes    
53  U.T D.N&H Functional Permanent Partly available Yes    
54 DAMAN Functional Permanent Partly available Yes    
55 DIU Functional Permanent Partly available Yes    

jnvs having less than 30 acres of land

Sl.No. Name of District exist  Area of land transferred (if applicable) Buildings available Infrastructure available Total Student's strength Remarks. 
1 2 3 4 5 6 7
1 BHAVNAGAR 22.84 Acres  S/B,K/D, Dorm-1.5 D/S, SQ- 23 Water supply, Electricity, Boundary wall, Play field, Generator B - 239  
2 DANGS 10 Acres     C No work is sanctioned yet.
3 GANDHINAGAR 26 Acres  S/B,K/D, Dorm-1.5 D/S, SQ- 23 Water supply, Electricity, Boundary wall, Play field, Generator B - 166  
4 JAMNAGAR 20.50 Acres S/B,K/D, Dorm-1.0 S/S, SQ- 40, MP Hall, Work Shop -2 Water supply, Electricity, Boundary wall, Generator A - 467  
5 MEHSANA       B - 131  
6 PANCHMAHAL       B - 40  
7 PATAN 27.60 Acres.  S/B,K/D, Dorm-5 S/S, SQ- 39 Water supply, Electricity, Boundary wall, Play field, Generator A - 349  
8 SABARKANTHA 27 Acres.  S/B,K/D, Dorm-5 S/S, SQ-40  Water supply, Electricity, Boundary wall, Play field, Generator A - 425  
9 AKOLA 17 Acres.      B - 77  
10 AURANGABAD 26.10 Acres.  S/B,K/D, Dorm-5 S/S, SQ- 40 Water supply, Electricity, Boundary wall, Play field, Generator A - 469  
11 GADCHIROLI 26 Acres.  S/B,K/D, Dorm-1.5 D/S, SQ- 17, MP Hall, Work Shop Water supply, Electricity, Boundary wall, Play field, Generator A - 445  
12 NASIK 29.4 Acres.  S/B,K/D, Dorm-2.0 D/S, SQ- 34, MP Hall, Work Shop Water supply, Electricity, Boundary wall, Play field, Generator A - 453  
13 OSMANABAD 26.25 Acres.  S/B,K/D, Dorm-2.0 D/S, SQ- 42 Water supply, Electricity, Boundary wall, Play field, Generator A - 418  
14 SATARA 28 Acres S/B,K/D, Dorm-5 D/S, SQ-40  Water supply, Electricity, Boundary wall, Play field, Generator A - 398  
15 SINDHUDURG 27 Acres.  S/B(20 No SP Sheds),K/D, Dorm-5 D/S, SQ- 39 Water supply, Electricity, Boundary wall, Play field, Generator A - 271  
16 DAMAN 14 Acres.  S/B,K/D, Dorm-1.0 D/S, SQ- 42 Water supply, Electricity, Boundary wall, Generator A - 124  
17 SOUTH GOA 17 Acres.  S/B,K/D, Dorm-1.5 D/S, SQ- 17 Water supply, Electricity, Play field, Generator A - 296  

Intake

A - 80 Students

B - 40 Students 

C - Nil

JNVs located in 10 acres land

Sl.No Name of District exist  Area of land transferred (if applicable)

Status of construction. 

Categorization of JNV (JNVST) Remarks. 
    Completed    In progress    
1 3 11 12 13 14 15
1 DANGS 10 Acres     C Temporary accomodation has not been provided and hence could not be made functional.

STATUS OF FUNCTIONAL JNVs IN PUNE REGION

Sl.No. State Total
Districts
Districts Remark Reasons
Covered Uncovered
functional non-functional
1 MAHARASHTRA 35 31 0 3 + 1 The unconvered districts are 1) Bhandara, 2) Dhule, 3) Mumbai (for mumbai one JNV for urban &one JNV for suburban) Suitable proposal yet to be received from the concerned Dist.Collector.
               
2 GUJARAT 25 18 2 5 The uncovered districts are 1) Navsari, 2) Ahmedabad, 3) Valsad, 4) Narmada & 5) Amreli Suitable proposal yet to be received from the concerned Dist.Collector.
               
3 GOA 2 2 0 0    
               
4 U.T. 3 3 0 0    
               
  TOTAL 65 54 2 8+ 1    

      SAFETY AND SECURITY MEASURES

SATUS OF FIRE FIGHTING ARRANGEMENT

Total No of JNV on Permanent site :  49

Total No of JNV on Temporary site : 5

Sl. No Description of Item No of JNVs having facilities as per col.No.2  REMARK
1 2 3  
1 Installation of fire fighting extingisherrs    
  i) No of JNVs where fire fighting extinguisher not instslled. 0  
2 Providing sand buckets    
  i) No of JNVs where sand buckets for fire fighting not provided. 0  
3 Evacuation time for each building    
  i) No of JNV where each building cannot be evacuated within two minutes time in case of emergency 1 Valpoi
  ii) Reasons for not fulfilling the requirement listed at (i) above Strucutral condition Valpoi
  a) No of JNV where adequate exit doors does not exists. 1  
  b) No of JNV where proper gang way/passage not exists    
4 Storage of inflamable material i.e. fuel for cooking    
  i) No of JNV where separate Bank in open space not provided for storage of cooking gas cylinders 19 Chandrapur, Jalgaon, Jalna, Latur, Nagpur, Nasik, Yavatmal, Bharuch, Vadodara, Mehsana, Akola, Ratnagiri, Panchmahal, Osmanabad, Jamnagar, Diu, Sili
  ii) No of JNV where gas pipe line not got checked and fitness certificate yet to be obtained from local gas agency under process  
  iii) No of JNV where cooking gas stove is placed at a lower place than the cylinder outlet precautions taken  
       
5 Adequte water supply for fire fighting purpose    
  i) No of JNV where adequate water supply not kept in reserve for fire fighting 15 Arrangement for the same is under process.
6 Teachers and students training    
  i) No of JNV where training to teachers & staff not given on fire protection techniques 0 Ahmednagar, Aurangabad, Chandrapur, Gadchiroli, Gondia, Nagpur, Nasik, Pune, Ratnagiri, Raigarh, Yavatmal, Bharuch, Gandhinagar, Kheda, Sabarkantha, Porbandar, Valpoi, Osmanabad, Washim, Dahod, Jamnagar, Rajkot, Surendranagar, Diu, Sili, Mehsana
7 i) No of JNV which are sensitive to fire 2 Akola, Vadodara
  ii) Steps taken for such schools to ensure proper safety measures    

    PRESENT STATUS OF JNVs at BHANDRA, DHULE, MUMBAI, MUMBAI SUBURBAN IN MAHARASHTRA STATE 

Sl.No. State Name of the  Uncovered Dist. Whether any proposal received from the State Govt. If the proposal is pending/under process, indicate the latest status (in brief)
1 2 3 4 8
I MAHARASHTRA 1) BHANDARA Yes Site selection Committee Visit Report with recommendation of location at Panchgaon or Beed Sitapur was sent to Hqrs by this Office letter No.F.20-16( )/NVS(PR)/2005/48 dated 6.04.2005 for favour of necessary action at Hqrs.
2) DHULE Yes Proposal for taking 20 Acres of land of Sugar Factory through Dist.Administration, dhule is in process.  The same piece of land was inpected by Assistant Commissioner & E.E, R.O., Pune with Principal, JNV,Nandurbar.  JNV, Nandurbar is in contact with Dist. Administration & Manager of Sugar Factory, Shirpur for early disposal of case.
3) MUMBAI-Sub URBAN No Proposal yet to be received from District Collector was requested for an appointment, reply awaited.
    4) MUMBAI No Proposal yet to be received from Dist. Collector. 

PRESENT STATUS OF JNVs at AMRELI, AHMEDABAD, VALSAD, NAVSARI & NARMADA IN GUJARATSTATE

Sl.No. State Name of the  Uncovered Dist. Whether any proposal received from the State Govt. If the proposal is pending/under process, indicate the latest status (in brief)
II GUJARAT 1) AMRELI Yes 30 Acres land for opening of new JNV has been selected and the case has been forwarded by Dist.Collector for final orders.
2) AHMEDABAD Yes The proposed site at Hathijan Village is accepted by NVS provided the H.T. line is shifted.  The matter is under pursuance with Dist.Administration by Principal, JNV,Gandhinagar.
3) VALSAD No No suitable proposal is received from the Dist.Collector.
4) NAVSARI No No suitable proposal is received from the Dist.Collector.
5) NARMADA No It is informed by the Principal that D.M. Narmada has assured to provide 15 Acres of land for JNV and have considered it on priority basis.
 

Circulars

REPAIRS & MAINTENANCE

  • Subhead A

        Annual maintenance & repairs.

  • Subhead B

Special repairs.

  • Subhead C

Day to day maintenance.


Annual Maintenance & repair

  • White wash, Colour Wash, Painting etc.
  • Cleaning of terrace tanks, OHT,UGS.
  • Repairs to damaged (patch)- plaster, flooring,Compound wall, development work etc.
  • Septic tank cleaning & removal solids(twice a year).
  • Cleaning of rain water Pipes, SW drains etc.

Special repairs

  • Repl. Of damaged electrical wiring.
  • Repl. Of damaged HDPE Pipe.
  • Const. Of new soak pit if old has to be abandoned.
  • Repl. Of damaged HDPE tanks.
  • Re-carpeting of road surface and repair of concrete paths, SW drains etc.
  • Repairs to leakage of roof.


Day to day maintenance

  • Maintaining of -W/s Scheme, Running Pump set, Treating, Storing & distributing water etc.
  • Attending to leakages in Pipes, taps & other fittings on immediate basis.
  • Clearing of Chock age of Sewer lines, toilets, bath rooms etc.
  • Replacement of damaged W/s, Sanitary & electrical fittings.
  • Repair of tube well Pumping set.
  • Maintenance of Generator set to keep it in running condition.
  • Maintenance RGSV & grass/flower beds in and around buildings.
  • Any other item if found essential.
  • Engaging Labour for the above purpose through a registered Contractor of Central/State Govt.
  • Allocation of funds by RO as under

Cat.A – Rs.One lacs per year

CBRI – Phase 0, I, II or CPWD – Phase A&B.

Cat.B – Rs.80 thousand per year.

CBRI – Phase 0,I or CPWD – Phase A

Cat.C – Rs.32 thousand per year.

CBRI – Phase 0 or CPWD - School bldg.

Temporary Site – Rs.15 thousand per year.

Allocation of funds for Annual Repairs & Maintenance

Rs.2 lacs per Vidyalaya (CPWD pattern) and Rs. 3.5 lacs as per vidyalaya (CBRI pattern) decided by the Hqrs directly to the Principal.

Others shall continue to prepare an estimate for accord of sanction by competent authority and the funds shall be placed directly to the CA(who prepared the estimate) or Principal depending on the CA.

Allocation of funds for Special repairs

Sanctioned directly to the CA who are executing permanent buildings

In case CA is fixed by the Chairman of VMC funds are given to DD,RO/Principal.

Day to day Maintenance

  • Procurement of Materials.

Full requirement for the quarter – first month.

Stock Register shall be maintained item wise.

Each page shall be initialed by the Principal.

Physical verification shall be done by the Principal twice every year and observations recorded.

Material shall be of approved make and of NVS specification.


Annual Repairs & Maintenance
  • Register of year wise Maintenance works.

Building Register depicting plinth area and year of white washing etc. building wise.

In case of execution by themselves

Material at site account

Engaging of labour through contract

Material to be purchased through open tender/call of quotations.

Water Problem

  • Vidyalayas facing water problem
  • Beed
  • Sabarkantha
  • Banaskantha
  • Seasonal water problem
  • Nagpur
  • Nasik
  • Sindhdurg
  • Washim
  • Yavatmal
  • Junagarh
  • Diu
  • Hingoli
Progress of Construction

Phase A

State - Maharashtra

  • Ratnagiri  – Ph-A work completed except Dev. Work is in completion stage.
  • Thane      – Ph-A work completed except Dev. Work is in completion stage.
  • Parbhani   –Ph-A work is just started.
  • Akola         – Ph A work is just started.

State - Gujarat

  • Gandhinagar – Ph-A work completed except some misc.Dev.work.
  • Banaskantha –Ph-A work completed except Dev.work, Play field etc.
  • Mehsana      – Ph-A work just started.
  • Vadodara     – Ph-A work is under progess.
  • Dang           - Ph- A work is under progress but stopped due to land dispute.
Phase B

State - Maharashtra

  • Pune          - Just started.
  • Ratnagiri     – Just awarded.
  • Raigad        - under progress.
  • Thane          - Ph-B work under progress.

Phase B

State - Gujarat

  • Banaskantha - Ph-B work is under progress.
  • Patan       - Bal. work of Ph-B i.e. Principals  & Guest House is under progress.
  • Bhavnagar  – Ph-B work is under progress.
Current Progress of other Construction
 Works

(State - Maharashtra, Gujarat, Goa,  U.T.)

  • Latur        – SQ work started.
  • Nagpur     – SQ and Addl Dining Hall just at tendering stage.
  • Nandurbar –Addl Dining Hall just awarded.
  • Noth Goa   – Bal. work is under progress, SQ and Dormitory are completed, Laboratory work and Balance work of Warden Residence just awareded. Current Progress is nil due to sudden land dispute.
  • South Goa   – C/O Dormitory (.25), SQ, two Lab, C/W, just awarded.
 Maintenance of External Electrification
  • Transformer

       Once in a year it shall be got inspected by the SEB authority and   certify for necessary action for keeping it in healthy working condition. Report to be submitted to RO in 1st week of JULY every year.

Area lighting and street lights are two different aspects

Servicing of Gen. Set at regular intervals depending on usage through authorised dealer.